M6 Stage 1 C2 Shaft and Cut and Cover

  • MC64's cutting and grabbing
  • Bentonite Plant
  • Nightwork
  • LB 45 at Cut and Cover

Project Outline

Construction of M6 Stage1 Project is by CPB Ghella UGL JV. The M6 Stage 1 connects President Avenue at Kogarah to the M8 at Arncliffe.

Scope of Works

Avopiling Australia Pty Ltd scope is to construct the C2 Shaft and the Cut and Cover section. The C2 shaft consist of 8 diaphragm wall panels 1000 mm wide to depth of 38.00 meters. The cut and cover section is made up of a 80No diaphragm wall 1000 mm wide to depths of 30.00 metres and a secant pile wall with a combination of 106No CFA and 102No bored piles using segmental casing to depths approximately 24.00 meters and 27No barrettes 1000mm wide x 35.00 meters deep.

Industry leading techniques and equipment

Our clients

  • Roads & Maritime
  • Department of Main Roads & Transport
  • Main Roads Western Australia
  • Transport for NSW
  • Queensland Rail
  • Sydney Water
  • Queensland Urban Utilities
  • Water Corporation
  • CPB
  • Lend Lease
  • John Holland
  • McConnell Dowell
  • OHL
  • Acciona Australia
  • Meriton
  • Brookfield Multiplex
  • Hutchinson
  • Probuild
  • JQZ Developer
  • Dragados
  • Samsung C&T
  • Bouygues Australia
  • Jaxon Construction
  • BMD
  • PTA WA
  • PTA WA 1