Westconnex Stage 3B Rozelle Interchange M4 Cut and Cover Stage 1 & 2 and Victoria Road East
Project Outline
The project is the cut and cover dive structure linking M4 / Iron Cove link tunnels to Anzac Bridge
Scope of Works
The project is a combination secant pile and soldier pile walls made up of 1012No bored piles using segmental casings with a drill depth ranging from 5.00 metres to 18.00 metrers.