Westconnex Stage 3B - Rozelle Interchange Temporary Retaining Wall
Project Outline
The Rozelle interchange is a part of the M4 and M5 Tunnel links between Haberfield and Arncliffe. John Holland and CPB JV is the contractor for this project stage.
Scope of Works
JHCPBJV awarded this section of the project to Avopiling Australia Pty Ltd to deliver the construction of temporary soldier pile wall made of 93No-880mmØ bored piles 19.00 metres deep using segmental casings.